Skip to main content MCC Crescent Shape Search RSS Facebook Twitter YouTube Instagram chevron pointing down
FALL 2020
12-Weeks Start: September 15
Middle 8-Weeks Start: September 15
2nd 5-Weeks Start: September 24
2nd 8-Weeks Start: October 12
3rd 5-Weeks Start: October 30

MCC students have the advantage of taking these classes: shorter than full-semester classes in order to finish faster or earn more credits for seamless transfer to a university but at MCC's tuition rate.

Fast-track your way to graduation and a degree.

Quality instruction. Shorter time frame. Long-term benefits.

Enroll for these classes in your myMCCKC account.
Not yet a student? Apply now!

Changes to Fall 2020 Course Instruction

Changes to the fall 2020 course schedule were made for the health and safety of our College community due to the COVID-19 pandemic. If you enrolled in fall 2020 courses before June 27, you may have changes to your schedule. Learn more on instructional models and course changes.

Browse Schedule

MCC-Business & Technology - 1st 8-Weeks

CIMM 100 Introduction to Machining and Manufacturing3 Cr.
CIMM 110 Manual Lathe Operation3 Cr.
CIMM 115 Manual Mill3 Cr.
CSIS 110 Information Technology Fundamentals3 Cr.
CSIS 111 Computer Hardware, Maintenance, and Troubleshooting3 Cr.
ETEC 211 Revit3 Cr.
EHSS 111 Introduction to Health and Safety for General Industry1 Cr.
EHSS 112 Introduction to Health and Safety for Construction1 Cr.
INTE 107 Industrial Electrical Safety2 Cr.
INTE 112 Industrial Electrical DC Principles2 Cr.
INTE 115 Electrical Print Reading3 Cr.
WELD 105 Welding for the Trades3 Cr.
WELD 110 Welding Industry Fundamentals3 Cr.
WELD 120 Thermal Cutting Processes Lecture1 Cr.
WELD 121 Thermal Cutting Processes Lab2 Cr.
WELD 130 Print Reading & Weld Symbols3 Cr.
WELD 150 Gas Metal Arc Welding I (GMAW) Lecture1 Cr.
WELD 151 Gas Metal Arc Welding I (GMAW) Lab2 Cr.
WELD 160 Gas Tungsten Arc Welding I (GTAW) Lecture1 Cr.
WELD 161 Gas Tungsten Arc Welding I (GTAW) Lab2 Cr.